The Nam Kong 1 Hydropower Station, with a total installed capacity of 160MW, is CWE’s third hydropower station project jointly developed in Laos under the build–own–operate–transfer (BOOT) model. It has been designated by the government of Laos as a backbone power station for electricity sales to Cambodia.