Through water environment improvement measures such as widening, dredging, and embankment construction of the Shenzhen River, the Shenzhen River Regulation Project Stage III, Phase II has effectively elevated the flood discharge standards of the waterway and reduced flood risks during the rainy season for both Shenzhen and Hong Kong, while also enhancing the urban environment.