After the completion of Roseires Dam Heightening Project, it raised the original dam by 10m, boosted the reservoir capacity by 4 billion m³ and increased the total installed power generation capacity by about 100MW. It ensures a steady and reliable water supply for the vast local irrigation areas and improves the power generation capacity of the power station.